ER-0026237 viewsPhoto Date: 10/5/2012
Photo Credit: Ron Clark
Description: EPA contractor using a torch to vaporize mercury in the cracks in the pavement. Children waiting on a school bus found mercury switches outside an abandoned building. They left some of the switches on the street so the bus would drive over them. The switches are made out of glass and easily broken.
CO-0007235 viewsPhoto Date: 04-14-16
Photo Credit: Ellie Hansotte
Description: Break at the 2016 IEHA Spring Conference
PV-0010234 viewsPhoto Date: Unknown
Photo Credit: Lee Green
Description: German cockroaches
ER-0027234 viewsPhoto Date: January 1, 2010
Photo Credit: Ron Clark
Description: EPA contractor monitoring for mercury in a classroom after a student brought a bottle of mercury to school and spilled it in the lockers and classroom.
OWS-0018234 viewsPhoto Date: 12/11/1
Photo Credit: Karl M Glaze
Description: This is a picture of a field plasticity tested soil that was too wet. The rolled soil is laying on the edge of two quarters to show the diameter of the rod obtained.
ER-0014233 viewsPhoto Date: 10/22/2009
Photo Credit: Jason Doerflein
Description: Wreckage of a propane truck after a fire.
POOL-0009232 viewsPhoto Date: 7/15/2014
Photo Credit: Jason Ravenscroft
Description: Pool pump room.
OWS-0016232 viewsPhoto Date: 5/19/14
Photo Credit: Karl M Glaze
Description: This is a picture of a location where the dye showed up within a couple minutes of starting a dye test, verifying the home was outleting to the hillside with the channel cut in it from water flowing out of a pipe.
POOL-0014230 viewsPhoto Date: 7/11/2014
Photo Credit: Jason Ravenscroft
Description: Main drain cover on a swimming pool.